Indore Metro: Transforming the City's Commute

The Indore Metro is presently in the process of constructing a mass rapid transit system (MRTS) aimed at serving Indore, the most populous city in Madhya Pradesh. This project is undertaken by the Madhya Pradesh Metro Rail Co Limited (MPMRCL).




The master plan for the Indore Metro, spanning approximately 94 kilometers in total, was developed by Rohit Associates Cities & Rails Pvt. Ltd. This comprehensive plan envisions the creation of four metro lines and two additional spurs that will criss-cross the city. The initial phase of this project will focus on implementing the Yellow Line (Line-3), which forms a circular route.


The Detailed Project Report (DPR) for Phase 1 of the Indore Metro, covering a distance of 33.53 kilometers, gained approval from the state government in December 2016 and later received the green light from the Central Government's cabinet in October 2018.


The Priority Corridor of the Indore Metro is anticipated to be completed and operational by August 2024, slightly surpassing its original deadline of August 2023. The entirety of Phase 1 is expected to be finalized by 2027.


Initially, the project was planned to be partly financed through an official development assistance (ODA) loan from the Japan International Cooperation Agency (JICA). However, the funding sources have now shifted to include the Asian Development Bank (ADB) for an undisclosed amount and the New Development Bank (NDB), which will contribute $225 million.


In September 2019, the foundation stone for Phase 1 of the project was laid by the state's Chief Minister. Construction commenced in February 2019 and is set to continue until 2027.


System Specifications:

- Top Speed: 80 km/h

- Average Speed: 34 km/h

- Track Gauge: Standard Gauge – 1435 mm

- Electrification: 750 V DC Third Rail

- Signalling: Communications-based Train Control (CBTC)


Key Figures:

- Operational: 0 km

- Under Construction: 16.217 km

- Approved: 15.1313 km

- Proposed: 57.18 km

Estimated Cost: Rs. 7500.80 crores

Estimated Daily Ridership (by 2027): 2.50 lakh/day



Indore Metro Phase 1 Lines 


Yellow Line (Line-3): Palasia – Railway Station – Rajwara- Airport – Bhawarsala – MR10 – Palasia (Ring Line)


- Length: 33.53 kilometers

- Type: Elevated & Underground

- Status: 16.217 kilometers are currently under construction, specifically the section between Gandhi Nagar and Mumtaj Bag Colony

- Depot: Super Corridor

- Number of Stations: 30


Station Names

1. Bhawarsala Square

2. MR 10 Road

3. ISBT / MR 10 Flyover

4. Chandragupta Square

5. Hira Nagar

6. Bapat Square

7. Meghdoot Garden

8. Vijay Nagar Square

9. Radisson Square

10. Mumtaj Bag Colony

11. Bengali Square

12. Patrakar Colony

13. Palasia Square

14. High Court / Hotel Residency

15. Indore Railway Station

16. Rajwada Palace

17. Maulana Azad Marg

18. Bada Ganpati

19. Ramchandra Nagar Square

20. Kalani Nagar

21. BSF

22. Airport

23. Gandhi Nagar Nanod

24. Super Corridor 6

25. Super Corridor 5

26. Super Corridor 4

27. Super Corridor 3

28. Super Corridor 2

29. Super Corridor 1


Indore Metro Proposed Lines


Line-1A: Sri Aurobindo Hospital – Collectorate office – Indore Bypass 1

- Number of Stations: 18


Station Names

1. Sri Aurobindo Hospital

2. Bhawarsala Square

3. Sanwer Industrial Area

4. Ganesh Sham Colony

5. Banganga

6. Laxmibai Nagar Square

7. Mara Mata Square

8. Imli Bazar Chowk

9. Rajwada Palace

10. Collectorate Office

11. Indore Icchapur Rail Crossing

12. Tower Square

13. Bhawarkuan Square

14. Holkar University/IT Park

15. Rani Bagh

16. Limbodi

17. Ralamandal

18. Indore Bypass 1



Line-1B: Sri Aurobindo Hospital – Collectorate office – Regional Park (1B)

- Number of Stations: 13


Station Names

1. Sri Aurobindo Hospital

2. Bhawarsala Square

3. Sanwer Industrial Area

4. Ganesh Sham Colony

5. Banganga

6. Laxmibai Nagar Square

7. Mara Mata Square

8. Imli Bazar Chowk

9. Rajwada Palace

10. Collectorate Office

11. Central Excise

12. Choithram

13. Regional Park


Line-2: Dewas Naka – Juni Indore – MHOW

- Number of Stations: 28


Station Names

1. Dewas Naka

2. Niranjanpur Circle

3. Aranya Nagar

4. IDA Park

5. Vijay Nagar Square

6. Bhamori

7. Patni Pura/St Joseph Church

8. Malwa Mill Square

9. Raj Kumar Bridge

10. Indore Railway Station

11. Juni Indore

12. Collectorate Office

13. Mhow Naka

14. Dusshera Maidan

15. Annapuran Temple

16. Narmada Public School (Ring Road)

17. Rajendra Nagar

18. Reti Mandi

19. IPS Academy

20. Shramik Colony

21. Indore Bypass-2

22. Pigdambar

23. Umariya

24. Maa Vaishanodevi Hospital

25. Haranyakheri / IIT Indore

26. Chinar Residency

27. MHOW


Line-4: MR9 – Indore Railway Station – Indore Bypass 4


- Number of Stations: 16


Station Names

1. MR9

2. Convention Center

3. Lahiya Colony

4. Chandragupta Square

5. Sukliya

6. Nanda Nagar Main Road

7. Mazdoor Maidan

8. Rajkumar Bridge

9. Indore Railway Station

10. Chhavani

11. Sri Agrasen Maharaj Chowk

12. Navlakha Bus Station

13. Teen Imli

14. Babul Nagar

15. Musakhedi

16. Indore Bypass 4


Indore Metro Fares (Ticket Prices)


As of now, Indore Metro's fare structure, ticket prices, and regulations have not been officially announced. These details will be determined closer to the commencement of commercial operations. The Madhya Pradesh Metro Rail Co Limited (MPMRCL) is planning to implement cutting-edge technology for its automatic fare collection (AFC) system, enabling the use of QR codes and Near Field Communication (NFC) phones for seamless fare transactions.


Indore Metro Tenders


For the latest updates on Indore Metro tender notices, you can visit the official website of MPMRCL. Comprehensive information regarding these notices, including details about bidders and contracts, can be found in greater detail on the news and construction page of the website.